Service Level
-
vs Last Month -
Stock-Out Rate
-
vs Last Month -
Forecast Accuracy
-
vs Last Month -
Total Inventory Value
-
vs Last Month -Service Level Trend (%)
Stock-Out Rate Trend (%)
Top 5 Cabang - Risiko Stock-Out Tinggi
| Cabang | Stock-Out Risk | Status |
|---|
Alerts & Warnings
Demand Forecast vs Actual Sales
Forecast per Cabang
| Cabang | Forecast (Unit) | vs Last Month | vs Last Year |
|---|
Inventory Planning
| Cabang | Produk | Stok Saat Ini | Safety Stock | Rekomendasi Order | Status |
|---|
Safety Stock
Formula: Z × σ × √(LT/30)
Dinamis berdasarkan variabilitas demand & lead time cabang untuk memitigasi risiko stock-out.
Reorder Point (ROP)
Formula: Safety Stock + (Avg Daily Demand × LT)
Titik pemesanan ulang otomatis dihitung berdasarkan waktu tunggu pengiriman cabang.
Lead Time
Parameter Logistik
Lead time distribusi antara hub logistik pusat ke masing-masing gudang cabang (3 - 10 hari).
Production Schedule (Gantt Chart)
Utilisasi Kapasitas
Service Level
93.2%
Stock-Out Rate
4.8%
Forecast Accuracy
86.7%
Fill Rate
94.1%
Service Level per Cabang
KPI Trend (12 Bulan)
Early Warning Alert
Menampilkan 0 dari 0 data
| Cabang ↕ | Wilayah (Region) ↕ | Kelompok Pulau ↕ | Kode Produk ↕ | Periode ↕ | Sales Qty Actual ↕ | Sales Qty Forecast ↕ | Service Level (%) ↕ |
|---|
Export Report System
Unduh lembar analisis supply chain secara instan berdasarkan filter yang aktif.
Visual Customization & System Settings
Pilih tampilan estetika yang paling sesuai dengan preferensi Anda.
Tema Dashboard
AI Chatbot Configuration
Konfigurasi kredensial model AI asisten untuk dashboard Anda.
System Details
| Project Name: | Integrated Supply Chain Planning System (ISPS) |
|---|---|
| Data Source: | Salinan dari case_study_sales_supply_chain_Jan2025_Apr2026.xlsx - Sales.csv |
| Total Branches: | 49 Cabang di seluruh Indonesia |
| Current Development Build: | v1.0.0 (Agentic Release) |